The repair in photographs
Ice shifted the supports and split a stringer. Rope rigging brought the dock back to level for the structural repair.
Swipe through the photos. Tap any photo to enlarge.

Section sagging after the stringer split.

Rope rigging used to bring the dock back into position.

Straight, level and back on its posts.







