The repair in photographs
Posts leaning after winter. Decking lifted, framing repaired, and a finished walkway back over the water.
Swipe through the photos. Tap any photo to enlarge.

Posts leaning in every direction after a hard winter.

Setting new stringers to a builder's level.

Finished walkway.
More from the work

End of the dock, post heaved off plumb.

Leaning posts at the end of the composite dock.

Dock repair in progress, with posts still leaning.

Decking off, framing exposed.

Joists, cross-members and bolted connections beside the post.

New stringers run back to shore.

Old framing stripped back to the posts.

Composite boards going down.

Decking in progress.

